levo

Budgeting

Preparing and using a flexed budget

  • 3 things to know
  • Unit AS 2
Start revising · £5/month

Overview

How a budget is restated for the output actually achieved, why comparing 12,000 units against a 10,000-unit budget misleads, which costs move and which do not, and where the method is difficult.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

How is a flexible budget prepared?

Numbers

A flexed budget sets total costs at £112,000 and actual total costs were £118,000. Calculate the variance and state its type

Key term

In a flexed budget, which costs are recalculated and which are left unchanged?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    How is a flexible budget prepared?

    Model answer

    Costs are separated into fixed and variable elements, and the variable elements are recalculated at the level of output actually achieved.

  2. 2

    A budget was set for 10,000 units with variable costs of £6 per unit and fixed costs of £40,000. Calculate the flexed budget for an actual output of 12,000 units.

    Model answer

    Flexed budget = (12,000 × £6) + £40,000 = £72,000 + £40,000 = £112,000.

  3. 3

    Using that flexed budget of £112,000, actual total costs were £118,000. Calculate the variance and state its type.

    Model answer

    The variance is £118,000 − £112,000 = £6,000 adverse.

  4. 4

    Why would comparing actual costs at 12,000 units with the original budget set for 10,000 units be misleading?

    Model answer

    The original budget totalled £100,000, so it would show an £18,000 adverse variance, most of which simply reflects the extra output rather than any inefficiency.

  5. 5

    In a flexed budget, which costs are recalculated and which are left unchanged?

    Model answer

    Variable costs are recalculated in proportion to the actual output, while fixed costs are left unchanged within the relevant range of activity.

  6. 6

    State two practical difficulties in preparing flexible budgets.

    Model answer

    Costs must be split accurately into fixed and variable elements, which is hard for semi-variable costs, and the extra work takes more management time than a fixed budget.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Enterprise and Entrepreneurship
The Central Purpose of Business Activity
Forms of Business Ownership
Stakeholder Groups

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A ratio.
profitabilityliquiditygearing

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

A salary is a fixed annual amount.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Budgeting, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.