levo

Waste Management

Landfill dependence and the landfill tax

  • 3 things to know
  • A2 1
Start revising · £5/month

Overview

Northern Ireland's past reliance on landfill and its current rates, why landfill is unsustainable, siting conditions and NIMBY objections, the landfill tax and its 2026 rate, NILAS, and landfill tax and diversion calculations.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Numbers

When was the UK landfill tax introduced, and what are its two rates?

Key term

Why has Northern Ireland historically relied so heavily on landfill?

Numbers

How has the share of council-collected waste sent to landfill in Northern Ireland changed?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Why has Northern Ireland historically relied so heavily on landfill?

    Model answer

    Landfill was long the cheapest and simplest disposal route, and suitable quarries and land were available. Little recycling or energy recovery infrastructure existed until the 2000s.

  2. 2

    How has the share of council-collected waste sent to landfill in Northern Ireland changed?

    Model answer

    DAERA figures show the landfill rate fell from 74.0% in 2006/07 to 14.0% in 2024/25. Most diverted waste now goes to recycling or energy recovery.

  3. 3

    What were Northern Ireland's recycling and energy recovery rates for council-collected waste in 2024/25?

    Model answer

    DAERA reported that 50.4% of council-collected waste was sent for recycling in 2024/25. A further 34.3% went to energy recovery.

  4. 4

    Why is over-reliance on landfill unsustainable?

    Model answer

    Landfill wastes materials and energy that could be recovered. Buried biodegradable waste produces methane and leachate for decades, and landfill space is running out.

  5. 5

    Why is it difficult to find sites for new landfills in Northern Ireland?

    Model answer

    Local residents usually object to the noise, odour, traffic, litter and vermin a landfill brings. Planning approval is therefore slow and uncertain.

  6. 6

    What geological and hydrological conditions does a new landfill site need?

    Model answer

    A landfill needs low-permeability ground, such as clay, and a deep water table. A site must avoid aquifers, floodplains and springs so that leachate cannot reach water supplies.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Fossil Fuels
Global Action on Energy Conservation and Climate Change
Macrogeneration
Microgeneration

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

Smart glass can switch from clear to .
tintedliquidbrittle

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Hazard means anything with the potential to cause harm.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Waste Management, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.