Realignment of a river channel and environmental costs of re-sectioning.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why is it usually cheaper to channelise a river than to move the people at risk?

Key term

Explain why channelisation is more likely to be used on an urban reach than a rural one.

Key term

How does making a channel more efficient help to prevent flooding in that reach?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is channelisation?

    Model answer

    Channelisation is the direct engineering modification of a river channel to change its course, its cross-section or its bed, in order to control the flow of water and sediment. It includes realigning the channel to make it straighter, re-sectioning it to make it wider or deeper, dredging accumulated sediment from the bed, and lining or reinforcing the banks. It is a form of hard engineering, working against the natural behaviour of the river rather than with it.

  2. 2

    Why do some rivers need to be channelised?

    Model answer

    Chiefly to reduce flood risk where valuable property and people already occupy the floodplain: enlarging the channel and speeding the flow means a greater discharge can be contained before the banks are overtopped. Other reasons are to drain waterlogged farmland and bring it into more productive use, to keep the channel deep and straight enough for navigation, to stop bank erosion undermining bridges, roads, embankments and buildings, to remove sediment that has reduced the capacity of the channel, and to allow land beside the river to be developed.

  3. 3

    Why is it usually cheaper to channelise a river than to move the people at risk?

    Model answer

    Because the settlement, its infrastructure, its services and its economic activity are already in place and represent a very large sunk investment, while the political and social costs of relocating a community are enormous. Engineering works are a one-off capital cost with predictable maintenance, and they can be funded and delivered within a single political term, whereas relocation requires land elsewhere, compensation, new infrastructure and public consent. This is why hard engineering has historically been chosen even where planners recognise that it is not the most sustainable answer.

  4. 4

    Explain why channelisation is more likely to be used on an urban reach than a rural one.

    Model answer

    The value of what is protected is far higher per square kilometre in an urban reach - housing, commercial property, transport routes, utilities and industry - so the benefits of a scheme are large enough to justify a high capital cost in a cost-benefit assessment. Space in a town is limited, so soft options that need land, such as washlands or restored meanders, are often not available, whereas a narrow engineered channel fits the constraints. Urban rivers are also already heavily modified, culverted and constrained by existing development, so there is little natural channel left to conserve.

  5. 5

    How does making a channel more efficient help to prevent flooding in that reach?

    Model answer

    Flooding in a reach occurs when discharge exceeds bankfull capacity. Deepening and widening the channel raises the discharge that can be contained, so a bigger flow is needed before the banks are overtopped. Straightening and smoothing the channel increases the gradient and reduces friction, which raises velocity, while the deepening and widening above raises the hydraulic radius, so the same volume of water is moved out of the reach in less time and the water level for a given discharge is lower. Together these mean the local flood peak passes through the reach inside the banks.

  6. 6

    What is the fundamental drawback of solving a flood problem by moving water downstream faster?

    Model answer

    The water has not been removed from the system, only delivered somewhere else sooner. A straightened, deepened reach discharges its flood peak downstream more rapidly and in a shorter, sharper pulse, and if that pulse now coincides with the peak from a tributary the combined discharge downstream is greater than it would naturally have been. Communities below the scheme therefore face a higher and earlier peak, so the benefit to one settlement is bought at the expense of another, which raises real questions of fairness as well as of effectiveness.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Processes That Shape Fluvial Environments
Human Interaction in Fluvial Environments
Global Biomes
Small-Scale Ecosystems

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

In long profile it is .
asymmetricalsymmetricalflat

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Greenfield means land that has never been built on.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Human Interaction in Fluvial Environments, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.