levo

Operations Management

Stock control diagrams and stock levels

  • 3 things to know
  • Component 1
Start revising · £5/month

Overview

Maximum stock level, re-order level and lead time.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What does a stock control diagram show?

Key term

What is the maximum stock level?

Key term

What is the re-order level?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does a stock control diagram show?

    Model answer

    A stock control diagram plots the level of stock held against time. Sawtooth lines show stock falling as it is used and jumping when a delivery arrives.

  2. 2

    What is the maximum stock level?

    Model answer

    The maximum stock level is the largest quantity a business is willing to hold. Storage space, cost and the risk of deterioration set that limit.

  3. 3

    What is the re-order level?

    Model answer

    The re-order level is the stock level at which a fresh order is placed. The level is set high enough to cover usage during the lead time.

  4. 4

    What is lead time?

    Model answer

    Lead time is the period between placing an order and receiving the delivery. A longer lead time forces a higher re-order level.

  5. 5

    What is buffer stock?

    Model answer

    Buffer stock is the minimum level a business plans never to go below. The reserve protects production against a late delivery or a surge in demand.

  6. 6

    What is the re-order quantity?

    Model answer

    The re-order quantity is the amount ordered each time stock reaches the re-order level. Larger orders earn bigger discounts but raise the cost of holding stock.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Enterprise, Business Plans and Location
Markets, Demand and Market Research
Business Structure and Sources of Finance
Revenue, Costs and Break-Even

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

£240,000 by £120,000 gives 2.
dividedmultipliedadded

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Capacity is the maximum output possible.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations Management, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.