Eduqas A-Level Computer Science A500QS
Data Structures: Arrays, Records and Hash Tables
Stacks, Queues, Linked Lists and Trees
Boolean Logic and Simplification
Algorithms, Pseudo-Code and Programming Constructs
Variables, Scope, Parameters and Identifiers
Recursion and Modular Programming
Sorting Algorithms
Searching and Shortest-Path Algorithms
Big O Notation and Algorithm Efficiency
Validation, Verification and Testing
Data Compression
Programming Paradigms and Computer Languages
Systems Analysis, Maintenance and Documentation
System Design and Human-Computer Interaction
Software Engineering Tools and Translators
Computing, Society and the Law
Computer Architecture, the Processor and Assembly Language
Input, Output and Secondary Storage
Networks, Protocols and the Internet
Data Transmission and Network Performance
Number Systems and Binary Arithmetic
Data Types, Characters and Floating Point
Files, Records and File Organisation
Databases, Normalisation and Entity Modelling
SQL, Big Data and Distributed Systems
The Operating System and Its Modes
Interrupts, Memory Management and Scheduling
Types of Software System
Data Security, Cryptography and Attack
Systems Analysis, Maintenance and Documentation
Waterfall, Agile and approaches to systems development
- 3 things to know
- Component 1
Overview
Waterfall approach to systems development, two advantages of the Waterfall approach and two disadvantages of the Waterfall approach.
What you need to know
Answer each one before you reveal it.
Describe the Waterfall approach to systems development.
State two advantages of the Waterfall approach.
Questions from this subtopic
Each one with the model answer underneath.
- 1
Describe the Waterfall approach to systems development.
Model answer
The Waterfall approach works through analysis, design, implementation, testing and maintenance as separate stages. Each stage is signed off before the next one begins.
- 2
State two advantages of the Waterfall approach.
Model answer
Deliverables and deadlines are known from the outset, which makes the project easy to manage. Full documentation is produced at every stage for later maintainers.
- 3
State two disadvantages of the Waterfall approach.
Model answer
The client sees nothing working until very late in the project. Requirements that change after sign-off are expensive to accommodate.
- 4
Describe the Agile approach to systems development.
Model answer
Agile development delivers a small working increment of the system in each short cycle. The client reviews each increment and helps set the priorities for the next.
- 5
State two advantages of the Agile approach.
Model answer
Changing requirements are absorbed easily because the plan is revisited every cycle. Continuous client involvement makes a badly misunderstood requirement obvious within weeks.
- 6
State two disadvantages of the Agile approach.
Model answer
The final cost and delivery date are hard to fix at the start. Documentation is lighter, which can make long-term maintenance harder.
Other ways to work this
The same content, four other ways.
Everything in your subscription
Runs, plus a mode for every other kind of session.
Every question in Systems Analysis, Maintenance and Documentation, on a schedule.
Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.