Cost of cure measure, difference in value measure and loss of amenity.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Compare the two measures a court may use to assess damages for defective work.

Key term

What is the cost of cure measure?

Key term

What is the difference in value measure?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is the cost of cure measure?

    Model answer

    The cost of cure measure awards the sum needed to put the defective work right. The measure suits a claimant who genuinely intends to have the work redone.

  2. 2

    What is the difference in value measure?

    Model answer

    The difference in value measure awards the reduction in the value of what was received. The measure suits a case where rebuilding would be out of all proportion.

  3. 3

    Which case decided between the two measures for a swimming pool?

    Model answer

    Ruxley Electronics and Construction Ltd v Forsyth [1996] concerned a pool built shallower than specified. Rebuilding would have cost about £21,500, which the House of Lords held was wholly disproportionate.

  4. 4

    What did the House of Lords award in Ruxley Electronics and Construction Ltd v Forsyth [1996]?

    Model answer

    The House of Lords awarded £2,500 for loss of amenity. The pool was still perfectly usable, so neither rebuilding nor a difference in value award was appropriate.

  5. 5

    What is loss of amenity?

    Model answer

    Loss of amenity compensates for the disappointed expectation of a particular benefit. The award recognises a real loss that no reduction in market value reflects.

  6. 6

    When will a court award the cost of cure despite its expense?

    Model answer

    Radford v De Froberville [1977] awarded the cost of building a wall the defendant had promised. The claimant genuinely intended to carry out the work.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Parliamentary and European Law Making
Delegated Legislation
Statutory Interpretation
Judicial Precedent

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

The court sits in .
StrasbourgLondonParis

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

A Public Bill changes the general law.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Contract: Remedies, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.