levo

Implementing

  • 3 subtopics
  • 9 things to know
  • Components 01, 02 and 03

Learn Implementing in runs of four questions, then keep it with spaced repetition.

What Implementing covers

Implementing is examined in all three written papers — the specification states that Components 01, 02 and 03 each assess content from across all the teaching modules, so nothing is confined to one paper. It covers using apparatus and techniques correctly, units for measurements and recording and presenting observations.

Where it is assessed

Components 01, 02 and 03

Every module can be assessed on any of the three papers.

Check the OCR specification ↗

The 3 subtopics

Each one has its own page.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Convert 2.5 cm³ to m³ and 25 cm² to m², show that v²=u²+2as is unit-consistent, and justify unit headings in tables.

Key term

Why should a circuit be switched on only while each reading is taken, why is a metre rule reading often started from the 100 mm mark, and how is a mirror-scale meter read?

Key term

Choose between a bar chart and a line graph, state what a final result must include, and justify the order of table rows.

Key term

Where in a circuit is an ammeter connected, and where is a voltmeter?

Key term

Express the newton in SI base units.

Process

Why should processed values be placed in their own columns rather than replacing the raw data?

Key term

Why is apparatus clamped to a stand rather than held by hand while readings are taken?

Key term

Express the joule in SI base units.

Key term

When is a bar chart the correct way to present results, and when is a line graph?

Take Implementing further

The same content, four other ways.

Commonly confused

Pairs that lose marks when they are blurred together.

  • Ammeter in series vs Voltmeter in parallel

    Ammeter in series: the circuit is broken at that point so the whole current in the component passes through the instrument itself. Voltmeter in parallel: The instrument is joined across the component, one lead at each end, so it experiences the same potential difference.

  • Raw data vs Processed data

    Raw data: a reading taken straight from an instrument and written down exactly as its scale or display gave it. Processed data: A value worked out by calculation from the readings, which belongs in a column of its own so the originals survive.

  • m/s with a division sign vs m s⁻¹ with negative indices

    m/s with a division sign: the solidus form, read the same way but ambiguous once several units are combined, since it does not show which are being divided by which. m s⁻¹ with negative indices: The index form, which states the power of each unit explicitly and stays unambiguous for a compound unit such as kilogram per metre per second squared.

Questions from this topic

Each one with the model answer underneath.

  1. 1

    What is parallax error and how is it avoided when reading a scale?

    Model answer

    It is the error caused by viewing a scale from an angle, and it is avoided by placing the eye directly in line with the mark being read, using a mirror scale or a set square where one is available.

  2. 2

    Where in a circuit is an ammeter connected, and where is a voltmeter?

    Model answer

    The ammeter is connected in series with the component so the same current passes through it, and the voltmeter is connected in parallel across the component.

  3. 3

    Why should a voltmeter have a very high resistance?

    Model answer

    So that it draws almost no current from the circuit and therefore does not change the potential difference it is measuring.

  4. 4

    Why should an ammeter have a very low resistance?

    Model answer

    So that it adds almost no resistance to the circuit and therefore does not reduce the current it is measuring.

  5. 5

    Why is apparatus clamped to a stand rather than held by hand while readings are taken?

    Model answer

    A hand cannot hold a position steady, so the quantity being measured drifts while the reading is taken and the arrangement cannot be reproduced for the next reading.

  6. 6

    What must be done before a thermometer reading is taken?

    Model answer

    The bulb must be fully immersed in the substance and left long enough for the thermometer to reach the same temperature as it.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Planning
Implementing
Analysis
Evaluation

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

The two charges .
attractrepelcombine

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

There are 2π rad in a full circle.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Implementing revision questions

What does Implementing cover in OCR A-Level Physics B?
3 subtopics: using apparatus and techniques correctly, units for measurements and recording and presenting observations. Each one has its own page with questions and model answers.
How is Implementing organised?
By the OCR H557 specification, subtopic by subtopic, so it matches the order you are taught it in.

Every question in Implementing, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.