Edexcel IGCSE Bangladesh Studies 4BN1
Towards Bengali Independence, 1947–75
Early Bengal, 600–c1538Section B option
The Mughal Empire, c1550–1764Section B option
Bengal Under British Rule, 1764–1911Section B option
The Road to Partition, 1909–47Section C option
Bangladesh: Establishing the New Country, 1975–2001Section C option
Location, Climate and Biomes
Tectonic and Glacial Processes and Hazards
Relief, Drainage and Flood Hazards
Natural Resources and Their Exploitation
Agriculture and Food Security
Manufacturing, Services and Transport
Globalisation and TNCs
The Challenges of Economic Development
Development Indicators and Population
Quality of Life in Rural Bangladesh
Quality of Life in Urban Bangladesh
Climate Change in Bangladesh
Manufacturing, Services and Transport
Transport and economic development
- 3 things to know
- Paper 2
Overview
Rivers and ferries, the Padma and Jamuna bridges, Dhaka Metro Rail, the Karnaphuli Tunnel, the ports, and how poor transport holds back development.
What you need to know
Answer each one before you reveal it.
Why are rivers important for transport?
What are the dangers of river transport?
Questions from this subtopic
Each one with the model answer underneath.
- 1
Why are rivers important for transport?
Model answer
Bangladesh has thousands of kilometres of navigable rivers. Ferries and launches carry people and cargo.
- 2
What are the dangers of river transport?
Model answer
Overloaded launches capsize in storms. Ferry disasters kill hundreds of people in some years.
- 3
What is the Padma Bridge?
Model answer
The Padma Bridge opened in June 2022. The bridge links the south-west to Dhaka by road and rail.
- 4
How was the Padma Bridge funded?
Model answer
The World Bank withdrew its loan in 2012. Bangladesh then paid for the bridge from its own funds.
- 5
What is the Jamuna Multipurpose Bridge?
Model answer
The Jamuna Multipurpose Bridge opened in June 1998 and is roughly 4.8 kilometres long. The bridge carries road, rail, gas and power links between the north-west and the east. A separate Jamuna Railway Bridge opened beside it in March 2025.
- 6
What is the Dhaka Metro Rail?
Model answer
The Dhaka Metro Rail's first line opened in December 2022. The line runs from Uttara to Motijheel.
Other ways to work this
The same content, four other ways.
Everything in your subscription
Runs, plus a mode for every other kind of session.
Every question in Manufacturing, Services and Transport, on a schedule.
Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.