Bringing the system into use and supporting it

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

Corrective maintenance, adaptive maintenance and service level agreement.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What has to be in place before a system goes live?

Key term

Why is the backup arrangement tested before going live rather than after?

Key term

Why is most of the money spent on a system spent after it is delivered?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What has to be in place before a system goes live?

    Model answer

    Before going live the system must be installed and tested in its live environment, the existing data transferred and verified, the users trained, the documentation delivered, the backup arrangements working, and the fallback plan agreed.

  2. 2

    Why is the backup arrangement tested before going live rather than after?

    Model answer

    A backup that has never been restored is not known to work, and a client discovers the fault at the only moment it matters. Restoring a test copy before going live is what proves the arrangement.

  3. 3

    What is a pilot, and what does it achieve?

    Model answer

    A pilot runs the new system for one part of the organisation while the rest continues as before. It exposes the system to real work and real users at a scale where problems can be absorbed, before the whole organisation depends on it.

  4. 4

    What is the drawback of running the old and new systems side by side?

    Model answer

    Running both means every transaction is entered twice, which doubles the workload for the period and needs staff the organisation may not have, so it buys safety at a cost that is not always affordable.

  5. 5

    Why is a period of close support planned immediately after going live?

    Model answer

    The first days generate almost all of the questions and reveal the problems that testing missed, so having someone available then resolves them before they become habits or workarounds.

  6. 6

    What is corrective maintenance?

    Model answer

    Corrective maintenance is work done to fix faults found after the system is in use, which are almost always ones the tests did not cover rather than ones they missed.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A check requires a value.
presencerangeformat

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in The Development Project: Build, Testing and Evaluation, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.