Designing and Manufacturing Products

Manufacturing planning and product evaluation

  • 3 things to know
  • AS 1 Paper 2
Start revising · £5/month

Overview

Work orders, flow process charts, critical path analysis and float with worked examples, batch time, choosing processes by scale, and formative and summative evaluation.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Process

Justify the choice of manufacturing process for 20,000 identical polypropylene lids with a snap fit.

Key term

What is a work order in manufacturing?

Process

What does a flow process chart record that a simple flow chart does not?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is a work order in manufacturing?

    Model answer

    A work order is a schedule listing each manufacturing operation in sequence. Each step names the tools, materials, time and quality checks needed.

  2. 2

    What does a flow process chart record that a simple flow chart does not?

    Model answer

    A flow process chart classifies every step as an operation, inspection, transport, delay or storage. Distances and times are often added, so wasted movement and waiting become visible.

  3. 3

    Which symbols are used on a flow process chart?

    Model answer

    A circle shows an operation and a square shows an inspection. An arrow shows transport, a D shows a delay and a triangle shows storage.

  4. 4

    Why do manufacturers try to remove delay and transport steps from a flow process chart?

    Model answer

    Delays and transport add time and cost without adding value to the product. Shorter routes and fewer waits make production leaner and cheaper.

  5. 5

    What is critical path analysis?

    Model answer

    Critical path analysis models a project as a network of activities with durations and dependencies. The longest route through the network is the critical path, which sets the shortest possible completion time.

  6. 6

    What is float in critical path analysis?

    Model answer

    Float is the time an activity can be delayed without delaying the whole project. Activities on the critical path have zero float.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Material Selection and Wood
Metals
Plastics
Composite and Emerging Materials

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

The output voltage is V.
356

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Hazard means anything with the potential to cause harm.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Designing and Manufacturing Products, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.