Recall questions on inventory control charts, buffer inventory, maximum inventory level and lead time, calculating the re-order level and re-order quantity, interpreting a chart and its main limitation.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define buffer inventory.

Key term

What is the maximum inventory level?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does an inventory control chart show?

    Model answer

    It shows how the quantity of an item held changes over time, together with the maximum level, the buffer level and the point at which a new order is placed.

  2. 2

    Define buffer inventory.

    Model answer

    Buffer inventory is the minimum quantity a business intends always to hold, kept as protection against late delivery or unexpectedly high demand.

  3. 3

    What is the maximum inventory level?

    Model answer

    The maximum inventory level is the largest quantity of an item a business is prepared to hold, set by its storage space, its cash and the risk of the goods becoming obsolete.

  4. 4

    Define lead time.

    Model answer

    Lead time is the period between placing an order with a supplier and receiving the goods.

  5. 5

    What is the re-order level?

    Model answer

    The re-order level is the quantity of stock remaining at which a new order must be placed, so that the delivery arrives before the buffer inventory is used up.

  6. 6

    State how the re-order level is calculated.

    Model answer

    Re-order level = average usage per day × lead time in days, plus the buffer inventory the business intends to keep.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Business Activity
Marketing
People
Operations

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

The Policy Committee.
MonetaryFiscalBudget

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Responsibility means the duty to carry out a task that has been given to you.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.