levo

Operations

Managing capacity: increasing output, cutting capacity and outsourcing

  • 2 things to know
  • Component 02
Start revising · £5/month

Overview

Recall questions on maximum capacity, ways of increasing capacity, rationalisation and the costs of cutting capacity, planned and unplanned maintenance downtime, and the uses and risks of outsourcing production.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What is meant by a business's maximum capacity?

Key term

Why does adding a night shift raise capacity more cheaply than building a new factory?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is meant by a business's maximum capacity?

    Model answer

    Maximum capacity is the greatest output the business can produce in a period using the equipment, premises and workforce it currently has.

  2. 2

    Give three ways a business can increase its capacity.

    Model answer

    It can buy additional machinery, add shifts or overtime, or take on more staff and more premises.

  3. 3

    Why does adding a night shift raise capacity more cheaply than building a new factory?

    Model answer

    The existing premises and equipment are used for more hours, so output rises with no capital spending, although shift premiums push the wage bill up.

  4. 4

    What is the risk of expanding capacity as soon as demand rises?

    Model answer

    If the extra demand proves temporary the business is left with equipment and staff it cannot use, and unit costs rise because fixed costs are spread across capacity that produces nothing.

  5. 5

    What is rationalisation?

    Model answer

    Rationalisation is reducing capacity by closing sites, selling equipment or cutting the workforce so that capacity matches the demand the business actually has.

  6. 6

    Give two costs of reducing capacity.

    Model answer

    Redundancy payments and losses on selling equipment have to be met, and the business loses the ability to respond quickly if demand recovers.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Business Activity
Marketing
People
Operations

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

The Policy Committee.
MonetaryFiscalBudget

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

Responsibility means the duty to carry out a task that has been given to you.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.