Finding the critical path

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

Critical path and crashing an activity.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why does the project manager watch critical activities more closely than the others?

Key term

What is meant by crashing an activity?

Key term

What is fast-tracking, and what does it cost?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define the critical path.

    Model answer

    The critical path is the longest chain of dependent activities through a project, and its length sets the shortest time in which the project can be completed.

  2. 2

    How is the critical path identified once the passes are complete?

    Model answer

    The critical path is identified by joining the activities that have zero float, meaning their earliest and latest dates are identical, and that chain runs unbroken from the start of the network to the end.

  3. 3

    Two chains join the same two points, one of 20 days and one of 14 days. Which is critical, and by how much can the other slip?

    Model answer

    The 20-day chain is critical, and the 14-day chain can slip by 20 − 14 = 6 days in total before it becomes critical too.

  4. 4

    A project runs A 5 days, then B 4 days and C 3 days in parallel, D 6 days after B, E 5 days after C, F 3 days after both D and E, then G 4 days. State the critical path and its length.

    Model answer

    The critical path is A, B, D, F, G, and its length is 5 + 4 + 6 + 3 + 4 = 22 days.

  5. 5

    Why does the project manager watch critical activities more closely than the others?

    Model answer

    Critical activities are watched most closely because any delay to one of them delays the whole project immediately, whereas a delay elsewhere is absorbed by spare time before it does any harm.

  6. 6

    An activity on the critical path finishes 2 days late. What happens to the project end date?

    Model answer

    A critical activity finishing 2 days late pushes the project end date 2 days later, unless time is recovered from a later activity on the same chain.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.