levo

Testing Strategies

User acceptance, alpha and beta testing

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

User acceptance testing, acceptance criteria and contractual significance of acceptance.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why should acceptance testing not be the first time users see the system?

Key term

State two risks of running a beta programme.

Key term

What should happen to faults found during acceptance that the customer agrees not to fix before go-live?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is user acceptance testing?

    Model answer

    User acceptance testing is the final testing carried out by the customer's own staff, using the agreed requirements to decide whether the delivered system is fit to be put into use.

  2. 2

    Who designs the acceptance tests, and against what?

    Model answer

    Acceptance tests are designed by or with the users, working from the requirements agreed at the start rather than from anything the developers produced later.

  3. 3

    What are acceptance criteria?

    Model answer

    Acceptance criteria are the conditions written down in advance that the system must satisfy to be accepted, such as every high-priority test passing and no outstanding fault of a stated severity.

  4. 4

    Why is acceptance testing carried out with the customer's own data?

    Model answer

    The customer's own data carries the volumes, the formats and the historical oddities of the real business, so the system is exercised on the cases it will actually meet rather than on data invented by the supplier.

  5. 5

    What is the contractual significance of acceptance?

    Model answer

    Acceptance normally marks the point at which the customer takes the system on, the final payment falls due and responsibility for further faults passes to a maintenance or warranty agreement.

  6. 6

    Why should acceptance testing not be the first time users see the system?

    Model answer

    Acceptance testing at the very end leaves no time to act on anything found, so a system first shown to users at that point either passes with reservations or misses its date; users should have seen and commented on it throughout.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Testing Strategies, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.