Project Management and the Systems Approach in Practice

Updating the plan to reflect slippage

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

What crashing a plan means, what fast tracking a plan involves and recorded every time the plan is changed.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Which three things does the developer update when a task overruns?

Key term

Why must the plan be updated as soon as slippage is known?

Key term

A task with six days of float slips by two days. What happens to the finish date?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Which three things does the developer update when a task overruns?

    Model answer

    The actual duration of the task, the dates of the tasks depending on it, and the critical path are all updated.

  2. 2

    Why must the plan be updated as soon as slippage is known?

    Model answer

    An out-of-date plan misleads everyone about the delivery date and hides the need for a decision.

  3. 3

    A task on the critical path slips by four days and nothing else changes. What happens to the planned finish date?

    Model answer

    The planned finish date moves back by four days, because every day lost on the critical path is lost from the whole development.

  4. 4

    A task with six days of float slips by two days. What happens to the finish date?

    Model answer

    The finish date does not move, because the two lost days are absorbed by the float and four days of float remain.

  5. 5

    Explain what crashing a plan means.

    Model answer

    Crashing a plan means shortening a critical task by adding resources to it, accepting extra cost in order to save time.

  6. 6

    Describe what fast tracking a plan involves.

    Model answer

    Fast tracking means starting a task before the task it depends on has completely finished, accepting the risk of rework.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.