Overview

Matching an approach to the client, the requirements and the time available, why short iterations suit an uncertain user, the risks prototyping carries, and recording the reasons for the choice.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Evaluation

Why is listing the advantages of the chosen approach not a justification?

Key term

How is a rejected approach dealt with in the justification?

Key term

What should the developer do if the chosen approach proves wrong halfway through?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What must a justification of a chosen approach contain?

    Model answer

    A justification states the features of the problem, names the approach chosen, and shows how that approach answers those features better than the alternatives.

  2. 2

    Why is listing the advantages of the chosen approach not a justification?

    Model answer

    Advantages listed alone do not show that a choice was made, so the rejected approaches must be discussed as well.

  3. 3

    How is a rejected approach dealt with in the justification?

    Model answer

    Each rejected approach is named together with the specific feature of the problem it fails to fit.

  4. 4

    Give one way of making a justification specific rather than general.

    Model answer

    A specific justification refers to actual features of the problem, such as a user who is available only monthly or a fixed deadline.

  5. 5

    Why is the choice of approach recorded before development begins?

    Model answer

    The recorded choice sets the stages of the plan and the documents to be produced, and can be reviewed later against what happened.

  6. 6

    What should the developer do if the chosen approach proves wrong halfway through?

    Model answer

    The developer records why the approach failed, adapts the remaining stages, and explains the change in the evaluation.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.