levo

Reasons for Systems Development and Systems Methodologies

The waterfall model

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

Stages of the waterfall model in order, situation in which waterfall is the right choice and situation in which waterfall would be the wrong choice.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Process

Explain why a requirement discovered during the testing stage is so expensive under waterfall.

Process

List the stages of the waterfall model in order.

Process

What has to happen at the end of a waterfall stage before the next stage may start?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    List the stages of the waterfall model in order.

    Model answer

    The waterfall model runs feasibility, requirements analysis, design, implementation, testing, installation and then maintenance, each one completed before the next begins.

  2. 2

    Why is the waterfall model given that name?

    Model answer

    The model is named after a waterfall because output flows down from one stage to the next and, in the classic form, does not flow back up.

  3. 3

    What has to happen at the end of a waterfall stage before the next stage may start?

    Model answer

    At the end of a waterfall stage the deliverable for that stage is reviewed and formally signed off, which fixes it as the agreed input to the stage that follows.

  4. 4

    Give two genuine strengths of the waterfall model.

    Model answer

    The waterfall model produces a complete set of documentation as a by-product of the work, and its fixed stages make progress easy to measure and a fixed price easy to quote.

  5. 5

    Explain why a requirement discovered during the testing stage is so expensive under waterfall.

    Model answer

    A requirement discovered during testing is expensive because the requirements document, the design, the code and the test plan were all signed off without it, so every one of them has to be reopened and reworked.

  6. 6

    When does a user first see working software under a strict waterfall approach?

    Model answer

    Under a strict waterfall approach a user first sees working software at the testing or installation stage, which may be a year or more after the requirements were agreed.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Reasons for Systems Development and Systems Methodologies, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.