Overview

Difference between the effort a task needs and its duration, dependency between two tasks and genuine dependency inside a database-driven solution.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What is the difference between the effort a task needs and its duration?

Key term

A task needs 12 hours of work and the developer can give it 3 hours a day. What duration should go in the plan?

Key term

Why do estimates for a first development usually turn out to be too short?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is the difference between the effort a task needs and its duration?

    Model answer

    Effort is the number of working hours the task consumes. Duration is the elapsed time between the task starting and finishing.

  2. 2

    A task needs 12 hours of work and the developer can give it 3 hours a day. What duration should go in the plan?

    Model answer

    The duration is four days, because 12 hours divided by 3 hours a day gives four days.

  3. 3

    Why do estimates for a first development usually turn out to be too short?

    Model answer

    A first estimate counts the coding and forgets testing, correcting faults, writing documentation and waiting for the user.

  4. 4

    How can an estimate be made more reliable?

    Model answer

    An estimate improves when the task is small, when similar work has been timed before, and when a contingency allowance is added.

  5. 5

    Define a dependency between two tasks.

    Model answer

    A dependency means one task cannot start or finish until another task has reached a stated point.

  6. 6

    Give an example of a genuine dependency inside a database-driven solution.

    Model answer

    The data entry form cannot be tested until the tables it writes to have been created.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.