Resource levelling and what is meant by a resource constraint.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Which resources besides people have to be planned for a desktop development?

Key term

Why is access to the user treated as a scheduled resource?

Key term

Define resource levelling.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Which resources besides people have to be planned for a desktop development?

    Model answer

    The plan must allow for development machines, the database software, the development environment and access to the user.

  2. 2

    Why is access to the user treated as a scheduled resource?

    Model answer

    The user is available only at agreed times, so interviews and reviews must be booked into the plan around that availability.

  3. 3

    Define resource levelling.

    Model answer

    Resource levelling means rescheduling tasks, moving the finish date if necessary, so that no period demands more resource than is actually available; moving tasks only within their float is resource smoothing.

  4. 4

    How would you plan for a technique the developer has not used before?

    Model answer

    The plan carries a separate learning task before the work that needs the technique, with realistic time allowed for it.

  5. 5

    State one risk of scheduling two tasks that need the same machine at the same time.

    Model answer

    Two tasks needing one machine cannot both proceed, so one of them is delayed and the schedule becomes unachievable.

  6. 6

    How does a plan record who is responsible for each task?

    Model answer

    Each task row names one owner, so responsibility for doing the work and for reporting progress is unambiguous.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.