Resources needed to develop a project

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

Five categories of resource that a development project consumes, skills matrix and four software resources a project must license or obtain.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Explain why adding developers to a project that is already late can make it later.

Key term

Distinguish a one-off capital cost from a continuing revenue cost, with an example of each.

Key term

What is a resource histogram, and what does a peak above the available line mean?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Name five categories of resource that a development project consumes.

    Model answer

    A development project consumes people, time, hardware, software and money, together with accommodation and the working space the team occupies.

  2. 2

    Why are people usually the largest cost on a software project?

    Model answer

    People are the largest cost because software is produced almost entirely by skilled labour, so salaries and contractor fees dominate a budget in which hardware and licences are comparatively small one-off purchases.

  3. 3

    What is a skills matrix, and how is one used in planning?

    Model answer

    A skills matrix lists each team member against each skill the project needs, and it is used to spot the skills held by only one person and to plan the training or recruitment needed before that work starts.

  4. 4

    Explain why adding developers to a project that is already late can make it later.

    Model answer

    Adding developers late makes a project later because existing staff must stop work to explain the system to the newcomers, and every extra person adds communication links, so output falls before it rises.

  5. 5

    A team of five people has how many two-way communication links, and a team of ten? Show the working.

    Model answer

    A team of five has 5 × 4 ÷ 2 = 10 links and a team of ten has 10 × 9 ÷ 2 = 45 links, so doubling the team size makes the communication load more than four times greater.

  6. 6

    Why is the users' time treated as a scheduled resource rather than assumed to be free?

    Model answer

    Users have their own jobs to do, so the days they spend in interviews, workshops and acceptance testing must be booked with their managers in advance or the project stalls waiting for people who were never released.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.