Recording progress against the plan

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

Progress log and what variance means in a project plan.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define a progress log.

Key term

Why is the actual duration of every task recorded?

Key term

Explain what variance means in a project plan.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define a progress log.

    Model answer

    A progress log is a dated record of what was done on each task, how long it took and what still remains.

  2. 2

    Why is the actual duration of every task recorded?

    Model answer

    Recorded actual durations show where the estimates were wrong, and provide the evidence for the evaluation at the end.

  3. 3

    Explain what variance means in a project plan.

    Model answer

    Variance is the difference between the planned figure for a task and the figure actually achieved.

  4. 4

    A task was estimated at 5 days and took 8 days. State the variance.

    Model answer

    The variance is three days over the estimate, because 8 days minus 5 days is three days.

  5. 5

    Why is percentage complete an unreliable measure on its own?

    Model answer

    Percentage complete is a judgement made by the developer, and the last part of a task usually takes far longer than the figure suggests.

  6. 6

    How often should progress be recorded on a development running over several months?

    Model answer

    Progress is recorded at least weekly, so a delay becomes visible while there is still time to react to it.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.