levo

Project Management and the Systems Approach in Practice

Recording change requests and versions of the plan

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

Change request and what a change log contains.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define a change request.

Key term

What should a change request record contain?

Key term

Why is a change request assessed for impact before it is accepted?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define a change request.

    Model answer

    A change request is a recorded request to alter the agreed requirements, design or schedule of the solution.

  2. 2

    What should a change request record contain?

    Model answer

    A change request records the date, who asked, what is wanted, why, the effect on the plan and the decision taken.

  3. 3

    Why is a change request assessed for impact before it is accepted?

    Model answer

    Impact assessment reveals the extra time and the knock-on effects, so the decision is taken with the real cost known.

  4. 4

    Who decides whether a change request is accepted?

    Model answer

    The user and the developer decide together, because the user owns the requirement and the developer owns the estimate.

  5. 5

    Why is every version of the plan kept rather than overwritten?

    Model answer

    Keeping earlier versions shows how the plan responded as the development progressed, and prevents an old plan being mistaken for the current one.

  6. 6

    What distinguishes one issue of a plan from another?

    Model answer

    A version number and an issue date printed on the plan distinguish one issue from another.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.