Managing risk and change

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

Project risk, recorded in a risk register and four standard responses to an identified risk.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What is recorded in a risk register?

Key term

How are risks prioritised?

Process

Describe the steps of a formal change control procedure.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is a project risk?

    Model answer

    A project risk is something that has not happened yet but would damage the project's time, cost or quality if it did, such as a key developer leaving or a supplier delivering late.

  2. 2

    Distinguish a risk from an issue.

    Model answer

    A risk is a possible future event managed by planning ahead, while an issue is something that has already happened and must be dealt with now.

  3. 3

    What is recorded in a risk register?

    Model answer

    A risk register records each identified risk, how likely it is, how serious the effect would be, who owns it, the action planned to reduce it and the fallback if it happens anyway.

  4. 4

    How are risks prioritised?

    Model answer

    Risks are prioritised by combining likelihood with impact, so a risk that is both probable and damaging is dealt with first, while an unlikely risk with a trivial effect is simply recorded and watched.

  5. 5

    Name the four standard responses to an identified risk.

    Model answer

    The four standard responses are to avoid the risk by changing the plan, to reduce its likelihood or impact, to transfer it to someone else such as an insurer or supplier, and to accept it with a contingency ready.

  6. 6

    Give an example of reducing a risk rather than avoiding it.

    Model answer

    The risk of losing the only developer who understands the payment code is reduced by pairing a second developer with them and requiring the design to be documented, although the person may still leave.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.