levo

Managing Projects

Network diagrams and PERT

  • 3 things to know
  • A2 Unit 1
Start revising · £5/month

Overview

Drawing tasks and their dependencies as a network, the forward and backward pass, earliest and latest start and finish, and the three-point estimate that averages optimistic, likely and pessimistic times.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What does PERT add to a network analysis?

Key term

What does a network diagram show that a bar chart does not?

Key term

Describe the activity-on-node form of a network diagram.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does a network diagram show that a bar chart does not?

    Model answer

    A network diagram shows the logical dependencies between activities as a connected structure, so the chains running through the project and the longest of those chains can be identified.

  2. 2

    Describe the activity-on-node form of a network diagram.

    Model answer

    In the activity-on-node form each activity is drawn as a box carrying its name, duration and calculated dates, and the arrows between boxes carry only the dependencies.

  3. 3

    How does the activity-on-arrow form differ, and what is a dummy activity?

    Model answer

    In the activity-on-arrow form the arrows are the activities and the circles are events at their ends, and a dummy activity is a dotted arrow of zero duration used to express a dependency that the layout could not otherwise show.

  4. 4

    What does a forward pass through a network calculate?

    Model answer

    A forward pass works from the start to the end of the network calculating the earliest start and earliest finish of every activity, and the largest earliest finish gives the shortest possible duration for the whole project.

  5. 5

    When an activity has two predecessors, how is its earliest start found?

    Model answer

    An activity with two predecessors takes the later of their earliest finish times as its earliest start, because the activity cannot begin until both of the things it depends on are done.

  6. 6

    What does a backward pass calculate, and where does it begin?

    Model answer

    A backward pass begins at the project end date and works towards the start, calculating the latest finish and latest start of each activity, meaning the last moment it could happen without delaying the project.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.