levo

Project Management and the Systems Approach in Practice

Building a plan capable of reflecting change

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

Baseline plan, rolling wave plan and scope creep.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What does it mean for a project plan to be capable of reflecting change?

Key term

Why is a plan drawn up at the start certain to need changing?

Key term

How does keeping tasks short make a plan easier to change?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does it mean for a project plan to be capable of reflecting change?

    Model answer

    A plan capable of reflecting change can have its tasks, dates and dependencies revised as the development progresses. The whole plan does not have to be rewritten.

  2. 2

    Why is a plan drawn up at the start certain to need changing?

    Model answer

    Estimates are made before the work is understood, and user requirements are refined as the development progresses.

  3. 3

    How does keeping tasks short make a plan easier to change?

    Model answer

    Short tasks localise a delay to a few days, so a slipped task is re-scheduled without disturbing whole stages.

  4. 4

    Define a baseline plan.

    Model answer

    A baseline plan is the version agreed at the start, kept unchanged so that later versions can be compared against it.

  5. 5

    Why is the baseline kept once the plan starts changing?

    Model answer

    The baseline is the only record of what was originally promised, so variance can be measured against something fixed.

  6. 6

    Where is contingency best placed in a plan that expects change?

    Model answer

    Contingency is best placed at the end of each stage rather than hidden inside individual tasks, so the spare time stays visible.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Project Management and the Systems Approach in Practice, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.