Evaluating delivery against the project plan

  • 3 things to know
  • A2 Unit 2
Start revising · £5/month

Overview

Comparing what was delivered with what was scheduled, where the estimates were wrong and why, what was dropped or deferred, and what the variance says for the next plan.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Explain what evaluating the development against the project plan involves.

Key term

Which figure shows most clearly whether the plan was realistic?

Key term

How should slippage be reported in an evaluation?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Explain what evaluating the development against the project plan involves.

    Model answer

    The evaluation compares the actual dates, durations and order of the work with the plan that was agreed and updated.

  2. 2

    Which figure shows most clearly whether the plan was realistic?

    Model answer

    The difference between the estimated and the actual duration of each task shows most clearly whether the plan was realistic.

  3. 3

    How should slippage be reported in an evaluation?

    Model answer

    Slippage is reported with the task affected, the size of the delay, its cause, and its effect on the tasks that followed.

  4. 4

    Why is the cause of a delay more useful than the fact of it?

    Model answer

    The cause is what can be avoided next time, while the delay on its own teaches nothing.

  5. 5

    What does it mean if every stage overran by roughly the same proportion?

    Model answer

    A consistent overrun points to an optimistic estimating method rather than to any single task going wrong.

  6. 6

    How is the chosen approach judged once the solution has been delivered?

    Model answer

    The approach is judged on whether it kept the work under control, absorbed the changes that arose and delivered on time.

Other ways to work this

The same content, four other ways.

Everything in your subscription

Runs, plus a mode for every other kind of session.

1Flash
2Imposter
3Fade
4Brain dump

Learn every subtopic in runs of four questions

Facts flash and fade, a wrong word hides in some of them, and a brain dump decides which questions are locked in.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram the night before, weakest topic first

A quick scan finds your weakest topics. Recall each fact you missed three times in a row.

A null is the of one.
absencepresencetype

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

✓What it iscovered
~Why it happenspartly there
How long it lastsnot there yet

Explain It tests your understanding

Explain a concept in your own words and see which of its points you covered.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The faults are the mistakes students make most often.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Testing and Evaluating the Solution, on a schedule.

Learn it in runs of four questions, each ending on a brain dump against the clock. Every question you lock in comes back the next day, then at longer gaps, each time just before you would forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.